18-05-2019, 05:07 AM
Went to GI this morning. Bridge parking was blocked off for construction at the entrance. Dump truck unloaded heavy construction equipment and stayed there with cones blocking the entrance. You could back into a few spots down by the bridge if it remains that way parking will be very limited. No squid in two hours. Ink from last night was visible in several spots on the bridge Better than a few days ago, no daytime squid yet.